Fatigue testing before shipment
Date: 12 June 2026
On 12 June 2026, a moulding machine underwent fatigue testing before shipment. The post for this pre-shipment test states that the machine was dry-cycled (run without sand) more than 2,000 times.
On 12 June 2026, a moulding machine underwent fatigue testing before shipment. The post for this pre-shipment test states that the machine was dry-cycled (run without sand) more than 2,000 times.